GSM14-01 Roy Hill Rail Cuttings

NRW contracted Global Surface Mining (GSM) to assist with the excavation of rock cuttings along the Roy Hill Rail Alignment.

GSM15-01 Albany Highway Upgrade

Main Roads WA (MRWA) through WA Stabilising contracted Global Surface Mining (GSM) to assist with the reconstruction of a section of Albany Highway in the Wheatbelt region of Western Australia.

GSM15-02 Tiger Brennan Drive Cuttings, Darwin

The Department of Infrastructure NT/BMD/Chief Group contracted Global Surface Mining (GSM) to assist with the excavation of rock on a number of significant cuttings along the Tiger Brennan Drive duplication alignment.

GSM16-01 Ghost Bat Caves

BHP Billiton Iron Ore through Austral Constructions contracted Global Surface Mining (GSM) to assist with the construction of the Ghost Bat Caves in area C which is located approximately 120km north-west of Newman in the Pilbara region of Western Australia.

GSM16-02 Princess Highway, Foxground and Berry Bypass

Fulton Hogan contracted Global Surface Mining (GSM) to assist with the excavation of rock on a number of significant cuttings along the Princess Highway Bypass, NSW.

GSM16-03 Olympic Dam Limestone Quarry

Between December 2015 and January 2016 Global Surface Mining carried out surface mining trial at Olympic Dam employing a Wirtgen 2500 Surface Miner in windrow mode.

GSM16-04 Westbrook Estate Sub-Division Melbourne

GSM carried out a trial of a surface miner, in the Westbrook Estate subdivision in the Western region of Melbourne in August 2016.

GSM17-01 Alba Potline 6 Bahrain

In 2016, GSM were contracted to complete the precision excavation works on Bechtel International's $3.5bn Aluminium Bahrain B.S.C (Alba), Potline 6 Expansion Project, successfully completed September 2017